{"generated_utc":"2026-09-28T06:53:16Z","range":null,"week":"2026-W39","from_utc":"2026-09-21T04:00:00Z","to_utc":"2026-09-28T04:00:00Z","history_days":30,"prev_week":"2026-W38","next_week":"2026-W40","next_page":null,"prev_week_url":"https://firmtape.com/geo/api/items?country=BA&week=2026-W38","offset":0,"count":5,"notable":1,"routine":4,"times":"UTC (the pages show New York time)","items":[{"uid":"e89b3c3da12582c8","feed":"entsoe_grid","sector":"ground","type":"no_data","category":"grid_data_gap","severity":1,"routine":true,"countries":["BA"],"title":"Electricity load data for Bosnia & Herzegovina stopped after 2026-09-26 09:00 UTC while other European grids kept reporting","summary":"","published_utc":"2026-09-26T20:00:32Z","event_utc":"2026-09-26T10:00:00Z","first_seen_utc":"2026-09-26T20:00:32Z","backfill":false,"source":"ENTSO-E","url":"https://transparency.entsoe.eu/load-domain/r2/totalLoadR2/show","value":null,"baseline":null,"score":null},{"uid":"4cd46448e27606ff","feed":"entsoe_grid","sector":"ground","type":"no_data","category":"grid_data_gap","severity":1,"routine":true,"countries":["BA"],"title":"Electricity load data for Bosnia & Herzegovina stopped after 2026-09-22 06:00 UTC while other European grids kept reporting","summary":"","published_utc":"2026-09-22T12:00:05Z","event_utc":"2026-09-22T07:00:00Z","first_seen_utc":"2026-09-22T12:00:05Z","backfill":false,"source":"ENTSO-E","url":"https://transparency.entsoe.eu/load-domain/r2/totalLoadR2/show","value":null,"baseline":null,"score":null},{"uid":"1b74889ea1d47b6c","feed":"entsoe_grid","sector":"ground","type":"spike","category":"grid_load_drop","severity":1,"routine":true,"countries":["BA"],"title":"Electricity load in Bosnia & Herzegovina fell to 66% of normal on 2026-09-21 at 20:00 UTC (673 MW vs 1,025 MW)","summary":"","published_utc":"2026-09-21T21:05:00Z","event_utc":"2026-09-21T20:00:00Z","first_seen_utc":"2026-09-22T00:00:04Z","backfill":false,"source":"ENTSO-E","url":"https://transparency.entsoe.eu/load-domain/r2/totalLoadR2/show","value":673,"baseline":1025,"score":0.66},{"uid":"189f232364ef61c5","feed":"gdacs","sector":"ground","type":"new","category":"gdacs_DR","severity":2,"routine":false,"countries":["AT","BA","BE","BY","CH","CZ","DE","DK","ES","FR","HR","HU","IE","IT","LI","LU","NL","PL","RO","RS","SE","SI","SK","SM","UA"],"title":"GDACS Orange Drought in Austria, Bosnia  and  Herzegovina, Belgium, Belarus, Switzerland, Czech Republic, Germany, Denmark, Spain, France, Croatia, Hungary, Ireland, Italy, Liechtenstein, Luxembourg, Netherlands, Poland, Romania, Serbia, Sweden, Slovenia, Slovakia, San Marino, Ukraine, ","summary":"Medium impact for agricultural drought in 1264372 km2","published_utc":"2026-09-21T14:57:03Z","event_utc":"2025-12-21T00:00:00Z","first_seen_utc":"2026-09-21T15:00:04Z","backfill":false,"source":"GDACS","url":"https://www.gdacs.org/report.aspx?eventid=1018332&episodeid=22&eventtype=DR","value":null,"baseline":null,"score":null},{"uid":"7c2b2749aefbf148","feed":"entsoe_grid","sector":"ground","type":"spike","category":"grid_load_drop","severity":1,"routine":true,"countries":["BA"],"title":"Electricity load in Bosnia & Herzegovina fell to 70% of normal on 2026-09-21 at 07:00 UTC (550 MW vs 791 MW)","summary":"","published_utc":"2026-09-21T08:05:00Z","event_utc":"2026-09-21T07:00:00Z","first_seen_utc":"2026-09-21T10:00:04Z","backfill":false,"source":"ENTSO-E","url":"https://transparency.entsoe.eu/load-domain/r2/totalLoadR2/show","value":550,"baseline":791,"score":0.7}]}